• ACAP Cape Breton

Pod Cast: ACAP Cape Breton and CBCL talk Wash Brook Flood Water Containment


As part of our eco-partnership with CBRM Wastewater, ACAP Cape Breton was asked to facilitate a pod cast to summarize Phase I of the CBRM commissioned report that detailed the Washbrook Flood Water Containment project. Jen Cooper, Project Manager at ACAP Cape Breton sat down with Alexander Wilson, Water Resources Engineer with CBCL to go over the proposed plans.

To listen to the pod cast please click the icon below.


0 views
We would like to begin by acknowledging that we are in Mi’kma’ki, the ancestral and unceded territory of the Mi’kmaq People. This territory is covered by the “Treaties of Peace and Friendship” which Mi’kmaq Wəlastəkwiyik (Maliseet), and Passamaquoddy Peoples first signed with the British Crown in 1726. 
Get Social with us!

Follow us on Facebook, Twitter, and Instagram!

 

  • Facebook Social Icon
  • Twitter Social Icon
  • Instagram Social Icon